top of page
BANNER PROJECTS
OUR PROJECTS

REAL PROJECTS.
REAL RESULTS.

We're proud to have worked on a wide range of projects across Northland. From residential homes to large-scale commercial and industrial builds, we deliver safe access solutions every time.

SCAFFOLDING SPECIALISTS
OUR COMPLETED PROJECTS
afff.png
94f6c879-97b9-4253-b1de-4215b44ff6c5.png
SILVER FERN FARMS DARGAVILLE

Industrial maintenance and access scaffolding designed for safe, efficient maintenance and shutdown works. Engineered to meet strict health and safety requirements while minimising disruption to site operations.

NAUMAI CHURCH
94f6c879-97b9-4253-b1de-4215b44ff6c5.png
NAUMAI CHURCH

Specialist heritage scaffolding designed to provide safe access for restoration, preservation, and roofing works. Installed with care to protect the historic structure while allowing multiple trades to work safely and efficiently.

propping.png
94f6c879-97b9-4253-b1de-4215b44ff6c5.png
KERIKERI MISSION HOUSE

Specialist heritage scaffolding providing safe internal access for restoration and conservation works. Installed with care to protect historic structures while delivering secure access for contractors.

church.png
94f6c879-97b9-4253-b1de-4215b44ff6c5.png
KAKARAEA CHURCH

Purpose-built heritage access scaffolding for restoration and maintenance of a historic church. Designed to preserve the building's character while providing safe, compliant access for all restoration works.

oturei.png
94f6c879-97b9-4253-b1de-4215b44ff6c5.png
OTUREI MARAE

Custom access scaffolding supplied for roofing, painting, and refurbishment works. Designed to provide safe, reliable access while respecting the cultural significance of the marae.

carshed.png
94f6c879-97b9-4253-b1de-4215b44ff6c5.png
VEHICLE WAREHOUSE

Large-span scaffold encapsulated with industrial shrink wrap, creating a fully weatherproof enclosure that allowed construction and maintenance work to continue safely and efficiently in all weather conditions.

learning.png
94f6c879-97b9-4253-b1de-4215b44ff6c5.png
NORTHTEC WHANGAREI

Commercial access scaffolding supplied for construction and refurbishment works. Engineered to provide efficient access while maintaining a safe working environment for multiple trades.

shrink.png
94f6c879-97b9-4253-b1de-4215b44ff6c5.png
HOANGA

Full shrink-wrap encapsulation system providing complete weather protection for the project. Designed to maintain productivity by allowing construction work to continue regardless of weather while protecting both workers and the structure.

winfarm.png
94f6c879-97b9-4253-b1de-4215b44ff6c5.png
WIND FARM MAITAHI

Specialist access scaffolding engineered to provide safe access beneath wind turbine blades for inspection, maintenance, and repair. Designed for challenging terrain while meeting the highest industrial safety standards.

34769315-0268-47f0-b5e0-ed8cd3966bd5_edited.png

50+

YEARS EXPERIENCE

15978d33-d1f6-4fac-b766-a16c9ffcef43_edited.png

3000+

PROJECTS COMPLETED

fbb037c6-9961-48db-8d51-56546f47de7e_edited.png

NORTHLAND

WIDE SERVICE

ec799f48-5afd-4628-872c-68c840a8d6bb_edited.png

SAFETY

FOCUSED

tRUCK.png

Hire Scaffolding provided exceptional service on our commercial build.
The team was professional, reliable and safety-focused from start to finish.
We wouldn't use anyone else.

— PROJECT MANAGER

COMMERCIAL BUILD, WHANGÄ€REI

BANNER
NEED SCAFFOLDING FOR YOUR PROJECT?

Get in touch today for a free, no-obligation quote.

d69f9163-21c6-4dc6-b481-288bdcb168de.png
b796a086-9784-424e-ba4a-d2d4b08d361e.png
e509030d-3173-4de9-b51a-de173012c941_edited.png
nz.png
preview (9).jpg
 > TESTIMONIAL

Words from our customers

To say that this 3 month modernization was a Herculean task would be an understatement. I remain convinced at this time, 2 weeks prior to occupancy that no other construction firm in the Bay Area could have handled such a task and pulled it off successfully. Alten collaborated with the district and design team on cost savings including.
​
Mr. R. Ramanujam
Director Operations and Sustainability
WhatsApp Image 2025-09-27 at 10.32.29 AM (1).jpeg
To say that this 3 month modernization was a Herculean task would be an understatement. I remain convinced at this time, 2 weeks prior to occupancy that no other construction firm in the Bay Area could have handled such a task and pulled it off successfully. Alten collaborated with the district and design team on cost savings including.
​🔸
Andrew J Cawthray
Chairman & Chief Executive
WhatsApp Image 2025-09-27 at 10.32.30 AM.jpeg
To say that this 3 month modernization was a Herculean task would be an understatement. I remain convinced at this time, 2 weeks prior to occupancy that no other construction firm in the Bay Area could have handled such a task and pulled it off successfully. Alten collaborated with the district and design team on cost savings including.
​🔸
Stuart Clark
Managing Director, Bingley LTD
WhatsApp Image 2025-09-27 at 10.32.29 AM.jpeg
bottom of page